An additional floor was added to an office building in Muttenz. The existing large terrace was also enclosed with prefabricated timber modules. The flat roof made from fully insulated box-beam modules bonded together maximised the room height. The façade cladding was adapted to match the existing eternit cladding. The new floor features a seamless transition from the existing building, making it hard to tell it’s an extension.
Services
General contractor
Prefabricated timber construction
Façade cladding
Interior fitting
Prefabricated timber construction
Façade cladding
Interior fitting
Speciality
Façade
Client
Bollinger Baumanagement AG
Neue Bahnhofstrasse 160
4132 Muttenz
Switzerland
Neue Bahnhofstrasse 160
4132 Muttenz
Switzerland
Architect
Bollinger Baumanagement AG
Neue Bahnhofstrasse 160
4132 Muttenz
Switzerland
Neue Bahnhofstrasse 160
4132 Muttenz
Switzerland
Completion date
November 2010