Häring AG constructed two residential blocks, providing nine terraced houses in total, in the Seebach district of Zurich. Each of the three-storey homes has four bedrooms and an open-plan living/dining room. The basements are solid constructions (up to and including ground level), switching to our modular system for the ground floor and upper storeys, which fulfils the Swiss Minergie-A ecological standard. All the cables and pipes were fitted within the individual elements, apart from the hallways, where the ceilings were briefly removed for this purpose.
Services:
- Prefabricated timber construction
- Interior fitting
Client
Zurich Canton Electricity Works
Dreikönigsstrasse 18
8022 Zurich
Switzerland
Dreikönigsstrasse 18
8022 Zurich
Switzerland
Architect
Schiess ITI AG
SIA / USIC planners
Schaffhauserstrasse 560
8052 Zurich
Switzerland
SIA / USIC planners
Schaffhauserstrasse 560
8052 Zurich
Switzerland
Area: | 1,212 m2 |
Completion date: | 31.12.2015 |
Duration: | 6 months |